Reply
 
LinkBack Thread Tools Display Modes
Old 09-14-2009, 05:23 PM   #1 (permalink)
Senior Member
 
Join Date: Jan 2009
Location: Santa Barbara, CA
Posts: 271
ekalpakoff is on a distinguished road
Default Rack elevations

When building rack elevations, I often see messages when I place items into a rack explaining that the part is already connected elsewhere to other item. When I am adding items into the elevations, or plan view for that matter, how does D-Tools (and Visio) handle the connection points and connecting items together. If I say yes to these dialog boxes, does it screw up our cable labels? If I attach a blank rack panel and it latches to the amp below it does it break the wire connections elsewhere?

Thanks
ekalpakoff is offline   Reply With Quote
Old 09-15-2009, 06:44 AM   #2 (permalink)
Super Moderator
 
NareshN's Avatar
 
Join Date: Nov 2006
Posts: 430
NareshN has a spectacular aura aboutNareshN has a spectacular aura aboutNareshN has a spectacular aura about
Default

Hi,
Take a look at these posts -

SI5.5: Managing Wire Connections D-Tools Support WikiBlog

Wire Auditing in SI 5 D-Tools Support WikiBlog

The Wire Auditing feature is basically a check in Visio/AutoCAD to prevent you from connecting the same wire to two different products. This should apply only for connections between wires and products. It looks like you are doing Rack Elevations and still getting this prompt when there is no wire involved - if so that is a bug and the audit check should apply for wires only.

I suggest when doing Rack Elevations do the following to turn off auditing -

1. Right click on drawing and click D-Tools -> Wire Options -> Wire Connection Options.

2. Uncheck "Prompt on Conflict" and click "Store Old Connection". This means any connections you make from now with an audit problem will NOT prompt you and the old connection will be stored in the projects database (new connections with audit problems will not write to project database). This way you can do your Rack Elevations with no inteference.
wire connection setting.JPG

3. Once you complete your Rack Elevations go to D-Tools -> Wire Options -> Wire Connection Options and click "Default" to return to the default auditing. This will again audit any fresh wire connections correctly.

This has been logged as a bug and the above is a workaround till we get this fixed.
NareshN is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Scaling Rack Elevations bcgconcepts Visio Shapes 6 04-30-2010 11:48 AM
Rack Layouts AaronB Visio Shapes 2 03-25-2009 04:52 PM
Rack Design Sounds Visio Shapes 2 04-23-2008 07:32 PM
Theater Design Elevations in Visio V. CAD ESD_STEVE Visio Other 1 09-10-2007 06:17 PM
Rack Attach Points spike 'How Do I' Questions 7 05-16-2006 11:40 PM


All times are GMT. The time now is 04:19 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.