long time
I have addressed this issue before, and hoped it would be resolved in 5.2
But its not...
I very often work with large drawing with a huge amount of wires. And i have noticed when the amount of wires increases, it slows down the time, from dropping a cable end to an equipment, to when you can connect the next end.
This can take from 1-2 seconds to almost a minute.
So making a drawing can take 3-4 times longer to complete because of this. And it's wearing down my patience.
And when the wirecount in one drawing exceeds 300 cables
Hope you understand what i mean...
Rgrds Bengt
|