Hi brnaer,
Here I am giving the steps to help you to “Change format of the appearance of the items of a package”.
The following steps are help you to change the
font size and
font type of the
Manufacturer text box and
font type and
Location of the
Price textbox in Proposal Level1, Level2 and Level3 report and align the Price value of the ProposalLevel2 and ProposalLevel 3 subreports straight to main report (Proposal level1) price value.
Steps –
1) Create a custom
Proposal Level3 report based on existing report “
Proposal Level3 items”.
2) Change the font-style of “
txtInstallPrice” textbox control to Font “Britannic” and “Bold” and “
txtManufacturer” textbox control to “Bold”.
3) Change the location of the ‘
txtInstallPrice’ X – 5.5 and Y - 0.063 as shown in figure "Level 3.png".
Level 3.jpg
4) Publish the proposal 3 sub report.
5) Create a custom
Proposal Level2 report based on existing report “
Proposal Level2 Items”.
6) Change the font-style of “
txtInstallPrice” textbox control to Font “Britannic” and “Bold” and “
txtManufacturer” textbox control to “Bold” as shown in figure.
7) Change the location of the ‘
txtInstallPrice’ X – 5.1 and Y - 0.063 as shown in figure "Level 2.png".
Level 2.jpg
8) Bind the Custom ProposalLevel3 report to the subreport located at the “
grpItemFooter” section. By Right click on the sub report and then click “
Bind to D-Tools Reports”, it will open a dialog, there you have to select the custom Proposal Level3 report created earlier as shown in figure "Bind Sub Reports 1to3.png" (See the Step 13).
9) Publish the Custom Proposal Level2 report.
10) Create a custom
Proposal report based on existing Proposal report.
11) Change the font-style of “
txPrice” textbox control to Font “Britannic” and “Bold” and “
txtModel” textbox control to “Bold”.
12) Change the location of the ‘
txPrice’ X – 5.13 and Y - 0.063 as shown in figure "Level 1.png".
Level 1.jpg
13) Bind the Custom ProposalLevel2 report to the subreport located at the “
grpItemFooter” section. By Right click on the sub report and then click “Bind to D-Tools Reports”, it will open a dialog, there you have to select the custom Proposal Level2 report created earlier.
Bind Sub Reports.jpg
14) Publish the Custom Proposal report.
15) Run the Proposal Report. Changes are made in the Report Successfully as shown in figure "Proposal Report.png".
Proposal Report.jpg
Regards,
Bala