Reply
 
LinkBack Thread Tools Display Modes
Old 10-26-2010, 05:24 PM   #1 (permalink)
Junior Member
 
Join Date: Jul 2010
Posts: 1
WCKennard is on a distinguished road
Default Proposal with Cost

We have a commercial project that we will be selling all the gear and labor at cost. We have worked out a marketing deal with the owner.
I am trying to create a proposal that reflects cost and not price. I have figured out how to get the price to show in the line item but I can't get it to summarize correctly. It still summarizes the price and not the cost even though price is out of the proposal.
Also, how would I go about summarizing labor cost?
WCKennard is offline   Reply With Quote
Old 10-26-2010, 05:31 PM   #2 (permalink)
Member
 
Join Date: May 2010
Posts: 41
J@Vissy is on a distinguished road
Default

IMO, labor would probably stay the same. I would create a report in report designer, simply change the unit price field to unit cost. Everything will be listed line item at cost, and still have all the same labor and tax factors.

If I was doing this, I would hide all cost, and just show a cost summary with labor breakout. Then you wont have confidential pricing shown. Then if you wanted, print a stock report proposal to show the variance of the discount they are getting?
J@Vissy is offline   Reply With Quote
Old 10-27-2010, 06:44 PM   #3 (permalink)
Administrator
 
SenoS's Avatar
 
Join Date: Mar 2006
Posts: 241
SenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond repute
Default

Did you also change the field from "dtr:Price" to "dtr:Cost" in the GrpDynamicFooter sections (see screen shot)? If it is the Project Summary section that you are referring to, here is a post showing how to modify and bind the "Project Summary Detail" subreport to a Proposal.
Attached Images:
File Type: jpg groupdynamicfooters.jpg (91.8 KB, 10 views)
SenoS is offline   Reply With Quote
Reply

Tags
cost, report


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 09:15 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.