Reply
 
LinkBack Thread Tools Display Modes
Old 09-15-2008, 09:12 PM   #1 (permalink)
Program Manager
 
RandyB's Avatar
 
Join Date: Mar 2006
Location: Concord, CA
Posts: 353
RandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond repute
Default Pick list for change orders

Q: In SI4, when you ran a Pick List report on a change order, it separated the parts so you could tell what was added, deleted, or changed. Is this possible in SI5?

Yes this is possible. You just need to modify the Pick List report to group by ChangeType. This technique can be used on any report that supports dynamic grouping.

For instructions, see this link:

http://downloads.d-tools.com/si5/rep..._Pick_list.htm

To download a sample report that will do this, click here:

http://downloads.d-tools.com/si5/reports/Other/Pick_List_by_Change.zip

- Randy
RandyB is offline   Reply With Quote
Old 09-16-2008, 12:40 PM   #2 (permalink)
Administrator
 
JoseM's Avatar
 
Join Date: Feb 2006
Posts: 358
JoseM is on a distinguished road
Send a message via MSN to JoseM
Default

Nice one Randy!
__________________
- JoseM
JoseM is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Sales orders missing? ekalpakoff Business Manager 2 09-23-2009 08:55 PM
Items Automatically Being Added to I/O List David_Haddad I/O Studio Feedback 0 04-27-2009 12:55 AM
Where did the change order pick list go? Theaterworks Reports and Reporting Center 0 02-11-2009 11:04 PM
Custom Pick List by Manufacturer jims SI4 Quick Tips and Customizations 1 06-06-2006 03:40 AM
Pick List by Manufacturer JordanC Suggestions and Feature Requests 1 04-18-2006 07:47 PM


All times are GMT. The time now is 08:24 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.