Reply
 
LinkBack Thread Tools Display Modes
Old 05-06-2008, 02:17 AM   #1 (permalink)
PowerTool User
 
Join Date: Mar 2006
Posts: 3
Matt Yaletchko
Default Error in Change Order Reports

I am having this new problem in Change Order Reports in the new release of 5.2. See attached. Please advise asap as none of the options used in the work around for 5.1 work.
Attached Files:
Matt Yaletchko is offline   Reply With Quote
Old 05-06-2008, 11:49 AM   #2 (permalink)
RickC
Guest
 
Posts: n/a
Default

Originally Posted by Matt Yaletchko View Post
I am having this new problem in Change Order Reports in the new release of 5.2. See attached. Please advise asap as none of the options used in the work around for 5.1 work.
Matt,

This is a report issue only in so far as a file this functionality depends on can not be found. I would guess that no reports are running at this point in time with the same error message.

This looks like an installation issue. One of the dependent assembly files cannot be located so my guess is that something went awry during the upgrade.

I would re-run the install for 5.2. If that doesn't work, please contact support.

-R
  Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
change order with wire weirdness grichards Bugs Section 4 01-19-2011 12:20 PM
Change order help Gurkha Business Manager 2 05-21-2009 09:01 PM
Change Orders: Item Selection & Reports fryeguy Business Manager 9 10-07-2008 11:46 PM
Change order limitations- what are you guys doing? Cinema_Solutions 'How Do I' Questions 10 01-26-2007 06:03 PM
Change Order Reports JordanC Business Manager 2 03-25-2006 02:02 AM


All times are GMT. The time now is 08:18 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.