Reply
 
LinkBack Thread Tools Display Modes
Old 01-04-2008, 11:02 PM   #1 (permalink)
Craig
Guest
 
Posts: n/a
Question Proposal w/ Graphics (Install Price)

Hello, I need some guidance on creating a report, basically a client report that does not show labor in the project summary. I have been all over the forums, read and printed the thread on customizing reports to no avail. I know this should not be that tough of an item, but I am just not getting anywhere. I appreciate all input and thank you in advance!
  Reply With Quote
Old 01-08-2008, 03:32 PM   #2 (permalink)
RickC
Guest
 
Posts: n/a
Default

Originally Posted by Craig View Post
Hello, I need some guidance on creating a report, basically a client report that does not show labor in the project summary. I have been all over the forums, read and printed the thread on customizing reports to no avail. I know this should not be that tough of an item, but I am just not getting anywhere. I appreciate all input and thank you in advance!
Craig,

Here's a link to a document that outlines the steps required based on my understanding of your request. Take a look and see if this is what you're trying to achieve.

-R

Installation_Price_Summary_In_Proposals
  Reply With Quote
Old 01-08-2008, 09:30 PM   #3 (permalink)
Craig
Guest
 
Posts: n/a
Default

Thanks for the reply RickC, that is exactly what we are after, although going through your instructions on step 7, you indicate to repeat steps 1 through 5, I was curious as to why?
  Reply With Quote
Old 01-09-2008, 12:47 PM   #4 (permalink)
RickC
Guest
 
Posts: n/a
Default

Originally Posted by Craig View Post
Thanks for the reply RickC, that is exactly what we are after, although going through your instructions on step 7, you indicate to repeat steps 1 through 5, I was curious as to why?
I repurposed a document that had the vast majority of the steps already defined and missed removing that line. The posted document has been updated.

Thanks for the heads up on the document.

-R
  Reply With Quote
Old 01-09-2008, 07:42 PM   #5 (permalink)
Craig
Guest
 
Posts: n/a
Default

Thank you very much for all the help, everything worked perfectly! Have a great day!
  Reply With Quote
Old 01-10-2008, 02:11 AM   #6 (permalink)
digitalint
Guest
 
Posts: n/a
Talking ThankYouThankYouThankYouThankYou!!!!

Holy Moly!! I have been trying to figure out how to do this for months! I could never figure out what anybody was trying to tell me though, I needed pictures. Rick - you're the man!
  Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
SI text install price ChristianB Business Manager 2 10-30-2009 12:49 PM
Project no longer displaying HeadEnd Dialog nor calculating Install price on Wires HickmottJ Bugs Section 1 06-08-2009 05:38 AM
Installed Price - after proposal RandyB Product Development Questions 2 02-27-2009 09:28 PM
proposal by location then price descending incontrol Reports and Reporting Center 1 02-05-2008 12:58 PM
Misc Parts too high, auto-doubling Net Price R2AV Troubleshooting and Problems 4 07-14-2006 10:43 PM


All times are GMT. The time now is 02:26 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.