Originally Posted by robeng32
|
|
I am having this problem. Is there a work around or a fix for this yet?
|
Each project is supposed to have a unique identifier associated with it (a GUID. It is foprmatted like 1C1111C1-C111-111c-CC1C-CCC1CCC111C, but the letters and numbers are different and no two generated are the same).
It may be a case where two projects have the same GUID. It may be that one was copied from the other (manually or otherwise) or that they were SI4 projects that were upgraded and one was based off the other so the GUID is the same.
I mention this as that is the mechanism by which the Delta projects are attached to the projects listed in the reporting center. I would make sure that the Delta is not being mistakenly attached to a different project.
If it is not, the reporting center generates a log file located:
C:\Documents and Settings\{user name}\Application Data\D-Tools\SI5\Reports\Log
where {user name} is the user currently logged into the PC.
Look for the newest log file, open it, scroll to the bottom and see if there is anything regarding exceptions while generating the Delta. If so, let us know and we can take a look from there.
-R