Reply
 
LinkBack Thread Tools Display Modes
Old 04-28-2011, 09:34 PM   #1 (permalink)
Senior Member
 
Join Date: Jan 2009
Location: Santa Barbara, CA
Posts: 271
ekalpakoff is on a distinguished road
Default Change order Scope of Work

Is there a way to include the SOW for the change order on the Change Order Report?
ekalpakoff is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 01:57 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.