Reply
 
LinkBack Thread Tools Display Modes
Old 07-15-2010, 05:07 AM   #1 (permalink)
ambleside
Guest
 
Posts: n/a
Default Group work

2 people hanging 3 TV's, want them both shown as busy for the day, want them both shown as working on the project. But I really don't want one guys work order to say hang 2 mounts and a TV and the other guys to say 1 mount and 2 TV's...I'd like them both to have the full job and account for their time according to their work...I see groups but I seem to be missing a step to get the work to actually show up on the techs work schedule....
  Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 01:57 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.