Reply
 
LinkBack Thread Tools Display Modes
Old 04-18-2011, 04:30 AM   #1 (permalink)
Junior Member
 
Join Date: Jan 2011
Posts: 1
fr33ze is on a distinguished road
Default How to generate report without Equipment Asjustment and Misc Parts

Hello,

I am trying to generate a report with just the items in the project (I have labor as an item) and tax. I have set all product data items to unit labor hrs as 0, and I have zeroed out everything in setup except taxes. Everything I try still gives me added cost of Equipment Asjustment and Misc Parts. I have no idea where this amount comes from and I just want it to go away.

Thanks

Ron
fr33ze is offline   Reply With Quote
Old 04-18-2011, 07:10 PM   #2 (permalink)
Administrator
 
SenoS's Avatar
 
Join Date: Mar 2006
Posts: 241
SenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond repute
Default

Hi Ron,
Check the Misc Parts and Equipment +/- fields within the project file for each Phase per this post. For all future projects, you will want to make the adjustment to each Phase listed under your Setup tab.
-Seth
SenoS is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 01:47 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.