Default Exporting Change Orders to Quickbooks

Maybe I am missing something here but how do I export a change order into quickbooks for billing?

Typically when a project is approved I will generate a sales order and export that to QB,

But what happens when I make modifications to items for the change?

What am I missing?
ekalpakoff is offline   Reply With Quote
Old 05-26-2011, 01:36 PM   #2 (permalink)
Administrator
 
SenoS's Avatar
 
Join Date: Mar 2006
Posts: 241
SenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond reputeSenoS has a reputation beyond repute
Default

Change Orders themselves cannot be exported directly to QuickBooks. Equipment that was added to a revision of a project can be added to an existing Sales Order for the project or a new Sales Order can be created and those products can be pushed over to QuickBooks. Equipment that was deleted or modified in a revision of a project cannot be added to a Sales Order so a manual reconciliation in QuickBooks is required.
SenoS is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 06:43 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.