Default Negative Ramifications of using the Disount Window in Packages

When the Discount Window is utilized and the package is pushed over from a sales order to QB it obviously does not transfer quantity properly.

Have there been any steps to take handle this issue?
__________________
Andy Nerdahl

Advanced Home Environments, Inc.

Media Systems Design & Estimating

612.964.3880 Mobile
651.731.3900 Office
651.501.4990 Fax
andy@advancedhome.biz
Andy N is offline   Reply With Quote
Old 10-10-2008, 10:29 PM   #2 (permalink)
Certified Partner
 
Kevin Mikelonis's Avatar
 
Join Date: Mar 2006
Posts: 364
Kevin Mikelonis has a spectacular aura aboutKevin Mikelonis has a spectacular aura aboutKevin Mikelonis has a spectacular aura about
Default

Through rigorous testing of QL into several financial management models, we have determined that the best way to do a discount on a project is through a line item in the database called discount.

The discount in packages, as well as the equipment+/- d and the misc part % all create severe headaches when pshing over to quickbooks - don't do it!
__________________
Kevin Mikelonis
Process Dealer Services Group
D-Tools Certified Partner
PO Box 3443
Paso Robles, Ca
805.275.2308
www.processdsg.com
info@processdsg.com

Stuff That Works
Kevin Mikelonis is offline   Reply With Quote
Old 10-10-2008, 10:41 PM   #3 (permalink)
Senior Member
 
Join Date: Mar 2006
Location: Novato (20 miles north of San Francisco)
Posts: 445
fryeguy is on a distinguished road
Default

Great feedback! Any word on whether this is being addressed in SI5.5?
I have been advocating for the adoption of LinkTools (eventually) but it must work perfectly!
fryeguy is offline   Reply With Quote
Old 10-10-2008, 11:22 PM   #4 (permalink)
Certified Partner
 
Kevin Mikelonis's Avatar
 
Join Date: Mar 2006
Posts: 364
Kevin Mikelonis has a spectacular aura aboutKevin Mikelonis has a spectacular aura aboutKevin Mikelonis has a spectacular aura about
Default

Originally Posted by fryeguy View Post
Great feedback! Any word on whether this is being addressed in SI5.5?
I have been advocating for the adoption of LinkTools (eventually) but it must work perfectly!

Although some bugs have existed, Linktools behaves itself when everything pushed over froma project is an item from the database.

Think about it...

What's in quickbooks is an item list connected to a chart of accounts.

When these discounts and misc parts multipliers that are found in D-Tools are used, numbers are created in your project that push to quickbooks and do not act like items in the quickbooks item list, so you end up with anomalies that you have to define in your item list and it gets messy.
__________________
Kevin Mikelonis
Process Dealer Services Group
D-Tools Certified Partner
PO Box 3443
Paso Robles, Ca
805.275.2308
www.processdsg.com
info@processdsg.com

Stuff That Works
Kevin Mikelonis is offline   Reply With Quote
Old 10-13-2008, 07:58 PM   #5 (permalink)
Senior Member
 
Join Date: Mar 2006
Location: Novato (20 miles north of San Francisco)
Posts: 445
fryeguy is on a distinguished road
Default

So I guess this means that LinkTools should work well for me. We do not use miscellaneous parts, or any of the labor multipliers for our work. Instead we have created "Wire Allowances" that are associated as accessories to specific products and additional Phases for Engineering, Programming, and Project Management to handle this portion of the scope.

I suppose if we push over a an Estimate with the "Wire Allowances" items and we have matching items in Quickbooks it should behave well. Then, when the allowances turn into real items, like a 2m HDMI interconnect, we can enter a Sales Order based on the actual cables and compare against the allowances from Quickbooks for job costing.

Currently, in order to have reasonable estimates of the work we have on the books, we enter equipment allowances & labor allowances as Estimates into Quickbooks to represent a Schedule of Values.
Then when equipment is ordered a PO is generated from the Estimate.
When equipment is received a Sales Order is generated from the Estimate.

With that said, LinkTooml would simply cut out the middleman and allow for the Estimate to be created in Quickbooks without double data entry.

Does this sound accurate?
fryeguy is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
no more Packages grichards Suggestions and Feature Requests 0 10-24-2008 07:22 PM
5.2 Packages with Default Accessories Kevin Mikelonis Bugs Section 3 07-24-2008 09:26 PM
Deleting/Archiving Packages Andy N General Section 1 05-01-2008 05:51 PM
Packages & Zones / Locations slemay Bugs Section 1 12-26-2007 06:46 PM


All times are GMT. The time now is 05:55 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.