Reply
 
LinkBack Thread Tools Display Modes
Old 08-08-2007, 04:23 AM   #1 (permalink)
Senior Member
 
Join Date: Sep 2006
Posts: 128
TouchToBegin is on a distinguished road
Default Difficulty Factor

Please tell me if I am handling this correctly.

It would seem to me that a 'difficulty factor' would apply on a job by job basis. In order to apply this to a project, I have to adjust it first in the application setup, then open the project and choose to reset the factors to default, and then go back to app setup and reset to my original settings. Is that the only way to apply this? That really is a difficulty factor.
TouchToBegin is offline   Reply With Quote
Old 08-08-2007, 05:10 AM   #2 (permalink)
Certified Partner
 
Kevin Mikelonis's Avatar
 
Join Date: Mar 2006
Posts: 364
Kevin Mikelonis has a spectacular aura aboutKevin Mikelonis has a spectacular aura aboutKevin Mikelonis has a spectacular aura about
Default

Originally Posted by TouchToBegin View Post
Please tell me if I am handling this correctly.

It would seem to me that a 'difficulty factor' would apply on a job by job basis. In order to apply this to a project, I have to adjust it first in the application setup, then open the project and choose to reset the factors to default, and then go back to app setup and reset to my original settings. Is that the only way to apply this? That really is a difficulty factor.
Difficulty factor is a great way to adjust labor of a phase.

It is done through the project though, by going to D-Tools>Options and selecting the Phases tab.

Changes in a project do not affect the setup tables for phases.

Difficulty factor adjusts the total labor hours for the phase and as a result the total dollars.

CAUTION!

Difficulty factor is not working properly in SI5 at this time. It is affecting the dollars in the phase rather that the hours and thus the dollars.

There are several other issues related to the difficulty factor that are not working properly in SI5 at this time which have been reported to D-Tools nad will hopefully be addressed in this service pack update expected this week.
__________________
Kevin Mikelonis
Process Dealer Services Group
D-Tools Certified Partner
PO Box 3443
Paso Robles, Ca
805.275.2308
www.processdsg.com
info@processdsg.com

Stuff That Works
Kevin Mikelonis is offline   Reply With Quote
Old 08-08-2007, 01:27 PM   #3 (permalink)
Senior Member
 
Join Date: Sep 2006
Posts: 128
TouchToBegin is on a distinguished road
Default User Error

Thanks. I was certain that I couln't edit that last night in the project Options area. It was late in the evening though...
TouchToBegin is offline   Reply With Quote
Old 09-11-2007, 03:04 PM   #4 (permalink)
PsiKoTicK
Guest
 
Posts: n/a
Default

Was the difficulty factor issue resolved with SP2?
  Reply With Quote
Old 09-11-2007, 06:25 PM   #5 (permalink)
Member
 
Join Date: Jun 2006
Posts: 44
dharmonyav is on a distinguished road
Default

Originally Posted by PsiKoTicK View Post
Was the difficulty factor issue resolved with SP2?
I don't see that in the release notes...
dharmonyav is offline   Reply With Quote
Old 09-12-2007, 06:34 PM   #6 (permalink)
PsiKoTicK
Guest
 
Posts: n/a
Default

I don't either, but it was never documented as an issue anywhere but this single post. I was just trying to verify if it is working correctly, and one of my designers was at Cedia and a tech there showed him a Sales Order with money on it, and a report with hours on it - and they were both correct. So, my best guess is "yes, it's fixed." However, it could be that each report does it's own math calculations, and it's not actually fixed.

Hence, why I was hoping for an official response
  Reply With Quote
Old 09-13-2007, 12:08 AM   #7 (permalink)
Program Manager
 
RandyB's Avatar
 
Join Date: Mar 2006
Location: Concord, CA
Posts: 353
RandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond reputeRandyB has a reputation beyond repute
Default Difficulty factor is working

Difficulty factor affects the number of hours it takes to install products in a given phase, and is working properly everywhere we know of at this time.
  1. The phase setup screen makes it appear that difficulty factor is multiplied by the rate, which is the reason for the confusion. We are looking at changing this screen to reduce the confusion, but there is no scheduled date for this yet.
  2. Difficulty factor as it applies to Project Hours, Gross Profit, Detail Cost Summary reports, as well as Work Orders, has been tested and is working as of SP1. It also works as related to individual product prices.
  3. If there are any other places where difficulty factor is found to be not working, please let us know and we will investigate and fix.
We apologize for the confusion.

Randy Bownds
Program Manager
D-Tools, Inc.
RandyB is offline   Reply With Quote
Old 04-10-2008, 05:51 PM   #8 (permalink)
Senior Member
 
Join Date: Mar 2006
Location: Novato (20 miles north of San Francisco)
Posts: 445
fryeguy is on a distinguished road
Default Labor Factors

I just did some testing on this and found that the reporting results are as they should be. If I double my labor difficulty from 100% to 200% my project hours double as well as the price of the total labor.

The phases tab under project options is certainly misleading.
The bottom line is that when I change my difficulty factor to 200% I am not selling labor at double the price but simply stating that work takes twice as long. Does this winodw need to be so different from the info available in SI4?
fryeguy is offline   Reply With Quote
Old 06-23-2009, 11:30 PM   #9 (permalink)
Senior Member
 
Join Date: Mar 2006
Posts: 235
avzone will become famous soon enoughavzone will become famous soon enough
Exclamation Difficulty Factor still broken?

BUG! BUG! BUG!

When I change the difficulty factor within a project from 100% to 200% and view the project summary within the project, it doubles the labor rate and does not update the labor hours. I thought this was fixed? If so, how should I go about troubleshooting this?

For the record, the hours are correct if I use Reports.
__________________
Graham Hickerson
Sound & Image Design, Inc.
1312 N. Parham Road
Richmond, VA 23229
graham@soundandimage.com
804.741.5816

Last edited by avzone; 06-23-2009 at 11:34 PM.
avzone is offline   Reply With Quote
Old 10-09-2009, 09:04 AM   #10 (permalink)
Member
 
Join Date: May 2008
Location: Chennai
Posts: 38
Hemanth is on a distinguished road
Default

Graham,

This bug has been fixed in 5.5 SP1.
Hemanth is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Difficulty per item? sburge General Section 3 11-18-2009 03:01 PM
What is the Limiting Factor for Off Pages References David_Haddad Suggestions and Feature Requests 3 07-24-2009 09:18 AM
Just getting started...Have a few questions Signature1007 New User Orientation and Getting Started 4 07-30-2008 05:45 PM