Reply
 
LinkBack Thread Tools Display Modes
Old 04-21-2011, 05:38 PM   #1 (permalink)
Senior Member
 
Join Date: Jan 2009
Location: Santa Barbara, CA
Posts: 271
ekalpakoff is on a distinguished road
Default Insert System Funky-ness

I have a newly create D-Tools project and would like to insert (2) previously create systems into my project.

First I create a new Visio File on my new project,
Then after opening the new Visio file I select D-tools -> Insert system and include everything,
Second, I do the exact same thing and insert the second project,

Results: All of the parts show up in my PDM correctly and all of the Visio pages show up as expected, however, it only calculates the money and the labor hours for the last system inserted.

Am I doing this wrong or is this a bug?
ekalpakoff is offline   Reply With Quote
Old 04-21-2011, 06:06 PM   #2 (permalink)
Senior Member
 
Join Date: Jan 2009
Location: Santa Barbara, CA
Posts: 271
ekalpakoff is on a distinguished road
Default

OK so I played around with it more and found this time I only selected it to import everything minus phase rates and project information. I still got the same results BUT what I did find was that the "Ignore Labor Calc" was checked even though I opted out of including phase rates. Still, the dollar amount on equipment is wrong.
ekalpakoff is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 06:29 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.