Default accessories showing negative in change order

This was an interesting bug that might affect change orders. When deleting speakers with brackets as accessories from one location and then adding them to another location and then running a change order (delta) the new brackets showed as negative. After testing different theories I noticed it only happened when the brackets were the exact same. Our work around was to reassign the location but that "change" doesn't show up when running a change order report.

I think that the delta report is not recognizing that the accessories are deleted and added separately.
aantrim is offline   Reply With Quote
Old 02-18-2010, 08:17 PM   #2 (permalink)
Member
 
Join Date: Mar 2006
Posts: 58
AVIR is on a distinguished road
Default

I am running across this exact issue right now. This is a huge issue.

My example: I have five "temp sensor" packages with equipment totaling $39.00, and 150 feet of Cat6. I deleted those, and added 16 of the same packages, this time with an equipment total of 75 feet of Cat6 for $19.50.

The CO report has the deleted wire correct. It shows 5 packages with 150 feet and a negative amount of $195. But then the new packages show a total of $19.50 in the price line, and a negative $39.00 in the accessories line with a 150 foot total (instead of the 75 feet it should be, in the positive).

This is a huge problem. It looks like the change order reports are entirely questionable and I will now be spending a lot of my time looking over each item and fixing it in the PDF.

PLEASE FIX THIS!
AVIR is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 04:35 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.