Default Update Labour rates AFTER project created = PROBLEM

Not sure if this is by Design or is a Bug BUT

If you change Labour rates in the Setup after a project has been created, each project item continues to use the old rates and there does not appear to be a way of forcing a refresh.

Not sure if this happens to the pre-configured phases but it certainly happens to phases which have been created manually.

Is this a bug or is this how it is supposed to work?
HickmottJ is offline   Reply With Quote
Old 03-06-2008, 01:20 PM   #2 (permalink)
Member
 
Join Date: May 2007
Location: UK
Posts: 68
HickmottJ is on a distinguished road
Default

Ignore. No a Bug, just poor understanding
HickmottJ is offline   Reply With Quote
Old 02-04-2010, 02:02 PM   #3 (permalink)
beanoandbarlow
Guest
 
Posts: n/a
Default How?

Hi There,

How did you resolve this? I am having the same trouble but don't seem to be able to fix.

Cheers
  Reply With Quote
Old 02-04-2010, 02:33 PM   #4 (permalink)
beanoandbarlow
Guest
 
Posts: n/a
Default

Sorted, thanks.
  Reply With Quote
Old 02-04-2010, 04:04 PM   #5 (permalink)
Administrator
 
JoseM's Avatar
 
Join Date: Feb 2006
Posts: 358
JoseM is on a distinguished road
Send a message via MSN to JoseM
Default

For future reference, this is not a bug, it is done by the design.

New projects use the labor calculations/settings that you currently have under the SETUP tab. If you make changes to those labor calculations in the SETUP tab existing proposals will not be updated with the new settings.

This is to preserve the settings you originally had as that is what you billed the job as. If you wish to update those settings on an existing project simply open the proposal in Estimator (text), click on the D-Tools menu and select Options > Phases, now select the phase you wish to update to match your Setup settings and click the RESTORE DEFAULT icon on the right.

If you want to update ALL phases instead of one by one click on the GENERAL tab in that same window and click on RESTORE DEFAULT OPTIONS.
__________________
- JoseM

Last edited by JoseM; 02-04-2010 at 04:06 PM.
JoseM is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
project file management grichards General Section 2 10-22-2009 06:29 PM
Project created date a992473 'How Do I' Questions 0 09-01-2009 11:35 PM
Updating Price after project created JordanC 'How Do I' Questions 1 06-26-2006 10:12 PM
Anyone creating Service Work Orders? FSUfan 'How Do I' Questions 4 06-21-2006 07:16 PM
D-Tools SI4.6 Release Notes JoseM General Section 1 03-02-2006 10:45 PM


All times are GMT. The time now is 05:56 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
D-Tools, Inc.