You need to create a custom report and when doing so check "List this report in Business Manager". Filtering can be created in the report at creation. For instance sometimes we have multi-contract projects where the RI/Trim is contracted to the GC and the Finish/Engineering/PM/Programming is contracted to the owner.
I created CO reports that are prefiltered for these scenarios and one that is for all Phases. A sidenote is that we do not use the management or design labor factors. Instead we create Phases for all the items listed above.
|