|
Originally Posted by KeithC
|
|
I know that you have done it boths ways--doesnt it take much more time to do it the d-tools way?
|
It depends where your worried about spending your time. For me, I see saving time in worrying about having enough of the correct wire at a job, or ordering more, than to worry about a couple of minutes extra it would take to make the proposal, that more accurate. Not to mention the ease of integration with QB. Inventory control can easily be maintained using footage counts per wire. Needing to save the few seconds per Product prewire, just doesnt overcome the possitive results I have seen going by proper make, model and lengths. (IN MY OPINION).
What do you think outweighs the other?